Illustrative business case · ENG-21
Is an out-of-hours compressed-air survey worth funding?
Estimate whether out-of-hours compressor demand warrants a site survey or repair budget.
ENG-21 · Compressed-air loss cost assessment · OXETC business-case whitepaper · Version 1.0, November 2026
The management decision
Use existing records to estimate how much electricity the compressor uses outside production. Confirm necessary demand with site personnel before treating the remaining amount as an opportunity worth a field survey.
Compressor electricity can be hidden in a site-wide bill. A machine that cycles while production is stopped may be serving essential equipment, compensating for leaks or responding to its control settings. A remote assessment gives management a range to investigate before approving survey spend. It also helps the site team choose what to measure if the existing records cannot distinguish the causes.
Worked example
An illustrative compressor averages 16 kW during 1,500 shutdown hours a year. If the site confirms that 6 kW is required, the remaining 10 kW represents 15,000 kWh to investigate. At an assumed £0.20 per kWh, that gives £3,000 of annual electricity exposure. The achievable reduction depends on what the survey finds and how the compressor controls respond.
| Example figure | What it represents |
|---|---|
| 16 kW | Average demand |
| 6 kW | Required demand |
| £3,000 | Cost to investigate |
What changes the answer
If essential use is actually 10 kW, the unexplained portion falls to 6 kW. Across the same hours and tariff the exposure falls to £1,800. A survey quote can be considered against both cases, allowing separately for repair costs.
What to commission
Assess one compressed-air system during an agreed production and shutdown period using existing records.
We compare the periods in your records, identify shutdowns when conditions were similar and check whether essential users were still connected. Where information is incomplete, we show how that affects the estimate and prepare questions for the responsible site engineer. Motor nameplate capacity alone cannot establish actual energy use.
How to judge the result
The site lead can reproduce the cost range and distinguish verified necessary demand from loss that still needs field confirmation.
Compare the cost of surveying and repairing confirmed losses with the value of the avoidable electricity. Verify performance after repair over a comparable operating period.
Decision worksheet
| Project detail | Starting point for your team |
|---|---|
| Decision owner | Engineering manager or facilities budget owner. Name the person who will approve the next step. |
| Records to gather | Compressor power or energy readings, operating schedules and details of essential air users. |
| Agreed output | A cost-range workbook, a breakdown of assumptions and a targeted brief for site verification. |
| Decision date | Record the deadline, any unresolved assumption and who will confirm it. |
Discuss this case
Tell us when the compressor normally runs, when production stops and why the cost has attracted attention. If you know whether actual power or energy readings exist, mention that in your email. We can discuss a useful starting period before requesting operational records.
Email [email protected] and mention ENG-21. All figures in the worked example are illustrative.