
Site energy review
See when your site uses energy and where to investigate avoidable demand.
Make equipment and energy decisions with a clearer view of cost, performance and risk.

See when your site uses energy and where to investigate avoidable demand.

Compare upgrade options before committing your capital budget.

Compare equipment bids on what suppliers can actually demonstrate.

Find out where your meters leave gaps in the picture of site energy use.

Give suppliers clear operating requirements for the equipment you need.

Spot fit and connection problems before equipment reaches the site.

See what else a proposed equipment change could affect before approving it.

Understand what changed between two drawings and which differences need attention.

See how planned equipment or schedule changes could affect peak site demand.

Request quotes that your team can compare without guessing what each supplier included.

Agree how equipment will be checked before the team is asked to accept it.

Find missing or outdated equipment records before they become maintenance problems.

Check how much energy use changed after an upgrade and what the evidence supports.

Compare sites fairly so your team knows where to investigate energy use first.

Focus your investigation on the conditions behind repeat equipment faults.

Identify which spare parts could leave important equipment out of service.

Give maintenance leaders a clearer view of which open jobs need attention first.

Decide how to judge an energy trial before the equipment or process changes.

Check whether a retrofit can fit your shutdown windows before work is scheduled.

Check whether a proposed substitute can meet the same needs as the original part.

Estimate whether out-of-hours compressor demand warrants a site survey or repair budget.
No matches. Try a shorter phrase or a service reference.
It is easier to discuss a new investment when everyone agrees what the site needs, what the supplier has demonstrated and what remains uncertain. OXETC reviews site and equipment records remotely to help teams answer those questions. That can mean investigating a rise in energy use, comparing competing upgrades or finding a practical issue in an equipment handover before it causes a delay.
Energy reviews use meter readings, operating hours and equipment information to show when usage changed and where the site team might investigate. Procurement reviews use requirements, drawings and supplier documents to make offers easier to compare. Change and handover reviews help track which equipment and documents a decision could affect and which records still need attention.
We identify the assumptions that could change the conclusion. If a replacement looks suitable on paper but its operating temperature cannot be confirmed, that becomes a specific question for the supplier or the site team. The appointed site team remains responsible for physical checks, installation, commissioning and decisions about safe operation.
You may receive a comparison workbook for a capital review, a list of supplier questions or a plan for the measurements your team should take next. Each service explains what you would receive and what the available evidence can reasonably show.
A metering coverage study (ENG-04) can tell you where several operations share the same meter and which extra measurements would help. A replacement part equivalence review (ENG-20) can show which differences or missing supplier details could affect whether a substitute is suitable.
A compressed-air loss cost assessment (ENG-21) estimates the electricity used outside production and identifies what essential equipment still needs. Use the range to decide whether a field survey is worth funding.
Email [email protected] with the equipment or location, the issue and the decision date. Tell us what records your team already holds, such as meter readings, drawings or a supplier quote. A short outline is enough to discuss what can be reviewed remotely and what should be confirmed locally.