DEV-01 · Software development

Site energy dashboard

See how sites use energy without combining separate spreadsheets each month.

What to share
Sample meter files, the sites to compare and the reports managers use today.
How we help
Build a dashboard that loads readings and compares sites over agreed periods.
What you receive
A working dashboard, tested data loading and a short guide for report users.

When this service helps

Regional teams often receive meter files with different site names and reporting periods. Staff spend time assembling figures, and managers may find it difficult to see why a chart changed after a correction. A dashboard gives them a consistent view of site use and a way to trace unusual figures back to the readings.

How we help

We agree how site names and periods should be matched, how to handle incomplete files and which numbers the dashboard should show. We test the link between a point on the chart and the record that produced it.

What you receive

Your team can see what to do when a file needs correction and how to check a figure before using it in a decision. The handover includes the agreed comparison and import checks so another owner can repeat them.

An example for your business case

In the illustrative case, four separate reports take 35 minutes each, or 140 minutes in total. A dashboard refresh with review takes 40 minutes, freeing 100 minutes. If review takes longer, the gain drops. Track time spent correcting data after launch as well as time spent preparing the report.

Start the discussion

Tell us who uses the report, how often it is updated and which comparison your team finds hardest to make. Mention whether the files come from several systems. One example of a chart your managers would like to see helps define a useful first build.

Email [email protected] to start the discussion. Include DEV-01 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Collect the site files
  2. Check the import
  3. Compare sites
  4. Follow a figure to its source
Illustrative business case

Time spent preparing four site reports

time preparing reports today
140 min
dashboard update and review
40 min
time freed per cycle
100 min

Illustrative business case · DEV-01

How much reporting work could one dashboard remove?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

DEV-01 · Site energy dashboard · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Time the full reporting cycle, including review and corrections. Use one familiar report to demonstrate whether managers can investigate a figure without rebuilding the underlying spreadsheet.

Regional teams often receive meter files with different site names and reporting periods. Staff spend time assembling figures, and managers may find it difficult to see why a chart changed after a correction. A dashboard gives them a consistent view of site use and a way to trace unusual figures back to the readings.

Worked example

Four site reports take 35 minutes each, or 140 minutes per cycle. A dashboard update taking 25 minutes plus 15 minutes of review would free 100 minutes for other work.

Example figureWhat it represents
140 minTime preparing reports today
40 minDashboard update and review
100 minTime freed per cycle

What changes the answer

If review takes 40 minutes instead, updating and checking together take 65 minutes, leaving 75 minutes available. Check for any extra work transferred to the people who correct the source files.

What to commission

Build one dashboard view using agreed site files and a named reporting period.

We agree how site names and periods should be matched, how to handle incomplete files and which numbers the dashboard should show. We test the link between a point on the chart and the record that produced it.

How to judge the result

A report user can refresh the sample, compare sites and trace a chart value back to its source reading.

Compare combined preparation and review time before and after the pilot. Measure correction work after reports are issued so the apparent gain is not shifted to another team.

Decision worksheet

Project detailStarting point for your team
Decision ownerRegional energy reporting manager. Name the person who will approve the next step.
Records to gatherSample meter files, the sites to compare and the reports managers use today.
Agreed outputA working dashboard, tested data loading and a short guide for report users.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us who uses the report, how often it is updated and which comparison your team finds hardest to make. Mention whether the files come from several systems. One example of a chart your managers would like to see helps define a useful first build.

Email [email protected] and mention DEV-01. All figures in the worked example are illustrative.