IT-13 · IT consultancy

Meter data quality diagnostic

Find out whether a change in energy use is real or caused by missing data.

What to share
A sample of readings, the expected frequency and the meters or sites involved.
How we help
Check for gaps, duplicates, changes in units and readings recorded at unexpected times.
What you receive
A data quality scorecard, flagged readings with notes and a ranked correction list.

When this service helps

An overnight drop in reported consumption can look like a saving. If readings went missing when a file export changed, the same chart could lead you to move investment away from a site that still needs attention. This review helps finance, facilities and energy teams decide where they can rely on the figures and what needs checking.

How we help

We trace selected problems back to the file they came from and show where they could change the reported trend. We keep confirmed zero consumption, estimates and missing readings distinguishable so managers can see what is known.

What you receive

Use the scorecard to decide which reporting periods are reliable enough for your decision and which issues to send to a meter or system owner. Your team can follow the selected flags back to the original file.

An example for your business case

Take ten days with 48 expected readings per day. Finding 472 of 480 leaves eight gaps. If two were expected to be absent because a meter was taken out of service, six gaps remain against a revised expectation of 478. The whitepaper shows how to make that distinction before drawing conclusions from a change in the chart.

Start the discussion

Tell us which change you noticed, when it began and what decision depends on the figure. Mention whether a meter, export or reporting process changed around that time. A short summary of the affected period is enough before we agree how to share a representative file.

Email [email protected] to start the discussion. Include IT-13 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Count expected readings
  2. Check readings received
  3. Sort the issues
  4. Trace them to the source
Illustrative business case

Expected, received and missing readings

expected readings
480
readings received
472
missing readings
8
View the interval coverage diagram

Illustrative business case · IT-13

Is the overnight energy saving real?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

IT-13 · Meter data quality diagnostic · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Hold the budget decision until someone can account for the missing readings. If the meter was retired, the expected count changes. If the file is incomplete, the apparent saving may disappear.

An overnight drop in reported consumption can look like a saving. If readings went missing when a file export changed, the same chart could lead you to move investment away from a site that still needs attention. This review helps finance, facilities and energy teams decide where they can rely on the figures and what needs checking.

Worked example

Ten ordinary days at 48 half-hour readings a day give 480 expected readings. The file contains 472 different readings, leaving eight missing, or 1.67%. Treat those periods as unknown until the source explains them.

Example figureWhat it represents
480Expected readings
472Readings received
8Missing readings

What changes the answer

Suppose a meter was retired before two of those readings were due. The expected total falls to 478, leaving six gaps or about 1.26%. Check clock changes separately because the expected daily count can also change.

What to commission

Review one meter or site for an agreed reporting period, including any change in meter status or export format.

We trace selected problems back to the file they came from and show where they could change the reported trend. We keep confirmed zero consumption, estimates and missing readings distinguishable so managers can see what is known.

How to judge the result

The owner can trace each sampled gap to its source and see which periods are reliable enough for the pending decision.

Recalculate the reported trend after confirmed corrections. Decide whether the difference still supports the investment decision or whether more readings are needed.

Decision worksheet

Project detailStarting point for your team
Decision ownerFacilities director or energy reporting lead. Name the person who will approve the next step.
Records to gatherA sample of readings, the expected frequency and the meters or sites involved.
Agreed outputA data quality scorecard, flagged readings with notes and a ranked correction list.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us which change you noticed, when it began and what decision depends on the figure. Mention whether a meter, export or reporting process changed around that time. A short summary of the affected period is enough before we agree how to share a representative file.

Email [email protected] and mention IT-13. All figures in the worked example are illustrative.