ENG-18 · Engineering consultancy

Energy pilot measurement plan

Decide how to judge an energy trial before the equipment or process changes.

What to share
The proposed trial, the decision it will inform and what the site can measure today.
How we help
Set a comparison period, how often to take readings and what would count as success.
What you receive
A measurement plan, a site log template and an approach for analysing the results.

When this service helps

A promising pilot can leave managers unsure what caused the result if they did not agree what to measure or how to compare it. By planning the measurement before the change, you give the project a fair chance to show whether it worked and whether a wider rollout merits investment. It gives colleagues an agreed set of checks to review alongside the result.

How we help

We agree how operating changes, interruptions and gaps should be recorded. We also identify periods that must be covered for a fair comparison, such as busy shifts or times when demand typically peaks.

What you receive

Your site team can use the materials to record what happened during the trial and to distinguish routine operation from unusual events. It manages the physical trial, meter checks and local operating decisions.

An example for your business case

Seven ordinary days at 15-minute intervals would produce 672 expected readings. If 30 are missing, 642 remain. The result can be less persuasive if most of those gaps fall during the busiest shift. Agree in advance how much evidence you need from important periods before using the trial to support an investment decision.

Start the discussion

Tell us what you want the trial to prove, when it starts and how soon you need to make a decision about wider use. Mention what meters are already available and which working periods matter most. We can discuss a plan that fits the site’s practical constraints.

Email [email protected] to start the discussion. Include ENG-18 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. State what the trial should show
  2. Choose a comparison period
  3. Agree when to measure
  4. Set the decision rule
Illustrative business case

Meter readings available during a trial

readings expected
672
missing readings
30
readings received
642

Illustrative business case · ENG-18

How will we know whether this energy pilot worked?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

ENG-18 · Energy pilot measurement plan · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Agree the success measure and the evidence needed before the trial starts. A gap during the busiest shift may leave you with too little information for a rollout decision.

A promising pilot can leave managers unsure what caused the result if they did not agree what to measure or how to compare it. By planning the measurement before the change, you give the project a fair chance to show whether it worked and whether a wider rollout merits investment. It gives colleagues an agreed set of checks to review alongside the result.

Worked example

Seven ordinary 24-hour days at 15-minute intervals give 672 expected readings. If 30 are missing, 642 remain for analysis. A count of available readings alone cannot show whether the trial covered important conditions.

Example figureWhat it represents
672Readings expected
30Missing readings
642Readings received

What changes the answer

If the 30 gaps all occur during the busiest shift, the trial may miss the very effect managers want to test. Agree the required coverage of busy periods in advance.

What to commission

Design the measurement plan for one proposed trial before it starts, covering busy periods and expected interruptions.

We agree how operating changes, interruptions and gaps should be recorded. We also identify periods that must be covered for a fair comparison, such as busy shifts or times when demand typically peaks.

How to judge the result

The site team has a recording schedule and an agreed rule for deciding whether enough comparable readings were collected.

Compare the observed result with the threshold for wider investment. Record unusual operating conditions and decide when the pilot needs more evidence.

Decision worksheet

Project detailStarting point for your team
Decision ownerEnergy pilot sponsor. Name the person who will approve the next step.
Records to gatherThe proposed trial, the decision it will inform and what the site can measure today.
Agreed outputA measurement plan, a site log template and an approach for analysing the results.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us what you want the trial to prove, when it starts and how soon you need to make a decision about wider use. Mention what meters are already available and which working periods matter most. We can discuss a plan that fits the site’s practical constraints.

Email [email protected] and mention ENG-18. All figures in the worked example are illustrative.