IT-04 · IT consultancy

Metering data standards

Give every team the same way to read and compare meter data.

What to share
A meter list, sample files and the ways your sites describe readings today.
How we help
Agree common rules for meter names, units and recording times.
What you receive
A written standard with examples and rules for converting existing records.

When this service helps

If one site reports power and another reports energy in a column with the same name, a group report can quietly compare different things. Inconsistent meter names or recording times can cause similar problems. Clear rules make it easier for teams to spot genuine differences and bring new sites into the same reporting process.

How we help

We check the rules against real source records and look for inconsistencies that could change a reported result. Where a reading could have more than one meaning, we identify what to confirm with the person responsible for that meter.

What you receive

Your reporting team or suppliers can use the same definitions when adding a source or checking a report. The guide records its version so that reviewers can see which rules applied when a file was prepared.

An example for your business case

In the whitepaper example, an average demand of 20 kW for half an hour represents 10 kWh of energy. Taking the figure of 20 as energy doubles that entry. If the period was 15 minutes, the energy used would be 5 kWh. The example shows why it matters to confirm both the unit and the period.

Start the discussion

Tell us which sites or systems disagree today. Mention a name, unit or timing difference that has affected a report, and identify the team that could confirm what the original reading means. We can use one export type to define the starting scope.

Email [email protected] to start the discussion. Include IT-04 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Read the source field
  2. Agree the definition
  3. Convert the value
  4. Verify an example
Illustrative business case

How power and energy relate

length of reading period
30 min
average power
20 kW
energy used
10 kWh

Illustrative business case · IT-04

Can we combine meter readings from different sites?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

IT-04 · Metering data standards · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Settle what each column measures before combining files. A common header can still conceal a difference in units large enough to distort a site budget.

If one site reports power and another reports energy in a column with the same name, a group report can quietly compare different things. Inconsistent meter names or recording times can cause similar problems. Clear rules make it easier for teams to spot genuine differences and bring new sites into the same reporting process.

Worked example

An average power reading of 20 kW over half an hour represents 10 kWh of energy. Importing the number 20 directly into an energy column doubles the consumption shown for that period.

Example figureWhat it represents
30 minLength of reading period
20 kWAverage power
10 kWhEnergy used

What changes the answer

For a 15-minute period the same load uses 5 kWh. Confirm the reading frequency and whether the source holds average power or a running energy total before applying any conversion.

What to commission

Agree meter names, units and time conventions for one export format used across two sites.

We check the rules against real source records and look for inconsistencies that could change a reported result. Where a reading could have more than one meaning, we identify what to confirm with the person responsible for that meter.

How to judge the result

A second analyst can convert sample readings from each source to the same reporting unit and period using the written rules.

Recalculate one previously disputed figure with the agreed rules. Record how many sources need correction and who owns each change before rolling it out.

Decision worksheet

Project detailStarting point for your team
Decision ownerEnergy reporting lead. Name the person who will approve the next step.
Records to gatherA meter list, sample files and the ways your sites describe readings today.
Agreed outputA written standard with examples and rules for converting existing records.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us which sites or systems disagree today. Mention a name, unit or timing difference that has affected a report, and identify the team that could confirm what the original reading means. We can use one export type to define the starting scope.

Email [email protected] and mention IT-04. All figures in the worked example are illustrative.