DEV-11 · Software development

Fault-to-work-order integration

Turn qualifying equipment alerts into traceable work orders without retyping them.

What to share
A sample of fault alerts, equipment identifiers and details of the work-order system.
How we help
Connect alerts to the equipment register and work-order system for one equipment group.
What you receive
A working pilot, a trace from alert to work order and recovery test results.

When this service helps

An alert can reach operations quickly while the maintenance team still has to look up the asset and enter a job by hand. Repeat notifications can create duplicate work, and an alert with an unknown asset can be lost in the process. A pilot connection helps account for each event and puts the information in the right system. That helps the maintenance team spot which alerts still need a person to act.

How we help

We agree which faults qualify, how to match each asset and what to do when there is no match. Tests cover repeat alerts and interruptions so staff can see whether an order was created or needs attention.

What you receive

The maintenance team can check that each qualifying event has a record and that repeats do not generate extra jobs. Staff still assess priority and authorise physical work using their site procedures.

An example for your business case

Imagine 40 notifications, including six repeats, creating 34 distinct cases. If three cases cannot be matched to an asset, the expected result is 31 orders and three visible exceptions. The team should still be able to account for all 40 notifications. That gives managers a useful check on the connection.

Start the discussion

Tell us which equipment group generates the most manual entries and how alerts reach maintenance now. Describe one repeated notification or difficult asset match. Mention who can confirm the rules for opening a job so we can discuss a practical pilot.

Email [email protected] to start the discussion. Include DEV-11 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Receive the alert
  2. Find the equipment
  3. Create the work order
  4. Verify the result
Illustrative business case

Accounting for alerts and work orders

alerts received
40
repeats
6
orders if all unique alerts qualify
34

Illustrative business case · DEV-11

Which fault alerts should become work orders?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

DEV-11 · Fault-to-work-order integration · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Agree what qualifies as a job before connecting the systems. The receiving team should be able to trace every alert and avoid assigning two people to the same fault.

An alert can reach operations quickly while the maintenance team still has to look up the asset and enter a job by hand. Repeat notifications can create duplicate work, and an alert with an unknown asset can be lost in the process. A pilot connection helps account for each event and puts the information in the right system. That helps the maintenance team spot which alerts still need a person to act.

Worked example

The pilot receives 40 events, six of them repeats. If all 34 distinct events qualify, expect 34 work orders and a trace for all 40 original events.

Example figureWhat it represents
40Alerts received
6Repeats
34Orders if all unique alerts qualify

What changes the answer

If three distinct events have no matching asset, expect 31 orders and three visible exceptions. The team must still be able to follow what happened to all 40 notifications.

What to commission

Connect alerts for one equipment class to a work-order system, including repeated alerts and an unrecognised asset.

We agree which faults qualify, how to match each asset and what to do when there is no match. Tests cover repeat alerts and interruptions so staff can see whether an order was created or needs attention.

How to judge the result

Every test alert maps to one valid order, an existing order or a visible exception with a responsible reviewer.

Compare manual entry, duplicated work and time spent resolving unmatched assets. Maintenance staff retain authority over priority and physical work.

Decision worksheet

Project detailStarting point for your team
Decision ownerMaintenance systems owner. Name the person who will approve the next step.
Records to gatherA sample of fault alerts, equipment identifiers and details of the work-order system.
Agreed outputA working pilot, a trace from alert to work order and recovery test results.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us which equipment group generates the most manual entries and how alerts reach maintenance now. Describe one repeated notification or difficult asset match. Mention who can confirm the rules for opening a job so we can discuss a practical pilot.

Email [email protected] and mention DEV-11. All figures in the worked example are illustrative.