DEV-05 · Software development

Meter data import connector

Bring meter files into one reporting system without losing rows along the way.

What to share
Sample meter exports, a description of the target dataset and known file differences.
How we help
Build an importer that converts the agreed file types and accounts for each submitted row.
What you receive
A tested import connector, field mappings and a log of rejected records.

When this service helps

When a site changes its export format, a reporting team can spend hours fixing files by hand. A poorly checked import can also finish while silently dropping readings. This connector turns agreed source files into a common dataset and records what happened to entries that could not be loaded. The result lets the report owner show the site exactly what needs attention.

How we help

We agree how fields should be translated and which values are required. We test representative files and make rejected rows visible with their reasons so the team knows what to fix and resubmit.

What you receive

A report owner can check the number of rows received, accepted and rejected before relying on the new figures. The mappings help the team update the connector if a site makes an agreed format change later.

An example for your business case

Take a file of 1,200 rows. If 1,175 are accepted and 25 rejected, the team can account for the whole file. If only 1,190 rows appear in the results, ten need investigation. Corrections should be linked to the original entries so the reported number of source rows stays accurate.

Start the discussion

Tell us where the files come from, where they need to go and the differences that cause most rework. Name the report that depends on them and any deadline for switching. We can start by agreeing which export format to use for a first test.

Email [email protected] to start the discussion. Include DEV-05 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Receive the file
  2. Match the fields
  3. Import the values
  4. Check the row count
Illustrative business case

Accounting for rows sent to a report

submitted
1,200
accepted
1,175
rejected
25

Illustrative business case · DEV-05

Did every reading reach the reporting system?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

DEV-05 · Meter data import connector · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Give the receiving team a simple count it can reconcile. A completed import is useful only when staff can find what was accepted, what failed and what to do about it.

When a site changes its export format, a reporting team can spend hours fixing files by hand. A poorly checked import can also finish while silently dropping readings. This connector turns agreed source files into a common dataset and records what happened to entries that could not be loaded. The result lets the report owner show the site exactly what needs attention.

Worked example

A site sends 1,200 rows. With 1,175 accepted and 25 rejected, all rows are accounted for. If results cover only 1,190, ten need investigation even when the system says the import completed.

Example figureWhat it represents
1,200Submitted
1,175Accepted
25Rejected

What changes the answer

If five rejected rows are corrected and sent again, link the new attempts to their original rows. The original batch size remains 1,200.

What to commission

Build an importer for one agreed source layout and target reporting dataset, including an invalid row and a corrected resubmission.

We agree how fields should be translated and which values are required. We test representative files and make rejected rows visible with their reasons so the team knows what to fix and resubmit.

How to judge the result

The report owner can account for every input row as accepted or rejected and trace corrected attempts to the original file.

Track reconciliation time, unresolved rows and reporting delays. Include the cost of maintaining mappings when a site changes its file format.

Decision worksheet

Project detailStarting point for your team
Decision ownerData operations or reporting manager. Name the person who will approve the next step.
Records to gatherSample meter exports, a description of the target dataset and known file differences.
Agreed outputA tested import connector, field mappings and a log of rejected records.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us where the files come from, where they need to go and the differences that cause most rework. Name the report that depends on them and any deadline for switching. We can start by agreeing which export format to use for a first test.

Email [email protected] and mention DEV-05. All figures in the worked example are illustrative.