IT-05 · IT consultancy

Energy reporting migration plan

Change reporting platforms without losing confidence in the numbers.

What to share
The reports you use today, sample outputs and the planned new platform.
How we help
Plan how reports move and how old and new results will be compared.
What you receive
A report-by-report migration plan, proposed comparison limits and a switch checklist.

When this service helps

A new platform can produce a group total that looks right while two site totals move in opposite directions. That matters when local managers are using those figures to explain spending or set budgets. Migration planning sets out what to carry over and how you will know that people can trust the new reports.

How we help

We identify the reports needed on day one, map them to their replacements and recommend checks at useful levels, such as site or reporting period. Report owners can agree acceptable differences and decide which discrepancies must be resolved before the switch.

What you receive

Project sponsors get a clear view of what must be tested, who approves each result and which reports can move later. The checklist also gives your team a shared basis for deciding whether to proceed on the planned date.

An example for your business case

In the illustrative comparison, one site is 40 units higher and another is 40 lower. The group total matches, but managers would still see differences at both sites. Testing a period with a late correction or credit note can uncover timing differences that a straightforward month would miss.

Start the discussion

Name the two or three reports you cannot afford to lose or get wrong. Tell us who signs them off and whether there is a planned switch date. If there is a disputed report already, explain whether that issue needs to be resolved as part of the migration.

Email [email protected] to start the discussion. Include IT-05 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. List reports
  2. Match old and new
  3. Run both versions
  4. Approve the switch
Illustrative business case

Why a matching total can hide site differences

site A
+40
site B
−40
total size of the differences
80

Illustrative business case · IT-05

When is an energy report ready to move?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

IT-05 · Energy reporting migration plan · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Use a site-level comparison to approve the new report. A match at group level alone can hide errors in the numbers each site manager is accountable for.

A new platform can produce a group total that looks right while two site totals move in opposite directions. That matters when local managers are using those figures to explain spending or set budgets. Migration planning sets out what to carry over and how you will know that people can trust the new reports.

Worked example

During a parallel test, one site moves up 40 units and another down 40. The group total matches even though the two local differences add up to 80 units in absolute terms. A local budget owner would reasonably want an explanation.

Example figureWhat it represents
+40Site A
−40Site B
80Total size of the differences

What changes the answer

Repeat the test for a period containing a credit note. Opposite timing differences can cancel at group level and still put a cost against the wrong site or month.

What to commission

Plan the move of a month-end report and compare one ordinary close and one containing a late adjustment.

We identify the reports needed on day one, map them to their replacements and recommend checks at useful levels, such as site or reporting period. Report owners can agree acceptable differences and decide which discrepancies must be resolved before the switch.

How to judge the result

The owners can reconcile old and new figures by site and sign off any agreed differences before switching.

Count remaining differences by cause and by affected budget. Set a tolerance with the report owners before using the new platform for a formal close.

Decision worksheet

Project detailStarting point for your team
Decision ownerFinance transformation or reporting lead. Name the person who will approve the next step.
Records to gatherThe reports you use today, sample outputs and the planned new platform.
Agreed outputA report-by-report migration plan, proposed comparison limits and a switch checklist.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Name the two or three reports you cannot afford to lose or get wrong. Tell us who signs them off and whether there is a planned switch date. If there is a disputed report already, explain whether that issue needs to be resolved as part of the migration.

Email [email protected] and mention IT-05. All figures in the worked example are illustrative.