When this service helps
A proposed machine may look manageable on its own until it runs at the same time as other large loads. Changing shift hours can have a similar effect. This study gives project sponsors a way to compare likely scenarios and identify the capacity questions that need answers before a purchase or schedule change. That early comparison can help the team decide what to ask a supplier to confirm.
How we help
We compare alternative schedules and operating patterns, track which periods set the highest demand and test the assumptions that drive the result. We note where finer readings or a local engineering check would change the level of confidence.
What you receive
The model helps leaders discuss options such as different operating times or additional capacity. The site engineer uses further evidence to verify equipment limits, short-duration peaks and the implications for the installation.
An example for your business case
An observed peak of 180 kW plus 45 kW of new demand at the same time gives a screening estimate of 225 kW. If only 20 kW overlaps, that period reaches 200 kW. A different time of day may then have the highest demand, so the assessment compares the whole schedule.
Start the discussion
Tell us which change you are considering and when it would happen during a normal day. Share what is driving the capacity question and the date of the planning or purchase decision. We can agree which scenarios and site records would be most useful.
Email [email protected] to start the discussion. Include ENG-09 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.