ENG-02 · Engineering consultancy

Upgrade feasibility study

Compare upgrade options before committing your capital budget.

What to share
Current equipment data, typical running hours and the options or quotes you are considering.
How we help
Compare the existing equipment and alternatives under the same operating conditions.
What you receive
An options report and workbook with estimates, assumptions and questions for follow-up.

When this service helps

A supplier's estimated saving can look attractive until you compare it with the hours your equipment actually runs. Installation costs, space, production needs and downtime can also change which option is worthwhile. A feasibility study helps you set a realistic basis for comparing upgrades and see which assumptions matter most to the investment.

How we help

We assess the available energy and cost information, test more than one operating pattern and identify missing evidence. We explain which information a supplier or the site team needs to confirm before you can rely on the comparison.

What you receive

Use the workbook to show how the preferred option changes when running hours or costs move. It gives the budget owner a way to decide whether to proceed with a more detailed assessment or gather evidence before spending.

An example for your business case

In the whitepaper, reducing input by 4 kW for 2,000 hours would save 8,000 kWh in a year. At 1,200 hours it would save 4,800 kWh. The difference could change which quote makes sense after installation costs. Confirm how often the equipment will run and whether it can deliver the required output before comparing annual figures.

Start the discussion

Tell us what you are considering replacing, why it is on the agenda and when the investment decision is due. Indicate any constraints on installation or shutdown. An outline of the candidate options is enough for an initial discussion.

Email [email protected] to start the discussion. Include ENG-02 if you have the reference, and let us know when you need to make the decision. We can agree how to share any sensitive material after the first conversation.

How it works

  1. Review current equipment
  2. Agree common conditions
  3. Compare options
  4. Test assumptions
Illustrative business case

How running hours change estimated savings

reduction in demand
4 kW
at 2,000 running hours
8,000 kWh
at 1,200 running hours
4,800 kWh

Illustrative business case · ENG-02

Which upgrade fits the hours the equipment actually runs?

See how the example was calculated, which assumptions change the result and what to check with your own figures.

PDF · 2 pages · 92 KB

Read the full business case

ENG-02 · Upgrade feasibility study · OXETC business-case whitepaper · Version 2.0, November 2026

The management decision

Base the investment decision on realistic operating conditions. Ask what would have to be true for the more expensive option to earn back its additional cost.

A supplier's estimated saving can look attractive until you compare it with the hours your equipment actually runs. Installation costs, space, production needs and downtime can also change which option is worthwhile. A feasibility study helps you set a realistic basis for comparing upgrades and see which assumptions matter most to the investment.

Worked example

A verified 4 kW reduction for 2,000 hours would avoid 8,000 kWh in a year. At 1,200 operating hours the same equipment change would avoid 4,800 kWh. The hours can matter as much as the performance rating.

Example figureWhat it represents
4 kWReduction in demand
8,000 kWhAt 2,000 running hours
4,800 kWhAt 1,200 running hours

What changes the answer

At 1,500 hours the result is 6,000 kWh. Use the buyer’s actual energy and installation costs to find the number of operating hours at which the preferred option changes.

What to commission

Compare the existing installation with two proposed upgrade options under the same operating hours and output assumptions.

We assess the available energy and cost information, test more than one operating pattern and identify missing evidence. We explain which information a supplier or the site team needs to confirm before you can rely on the comparison.

How to judge the result

The sponsor can vary running hours and identify the assumption or supplier answer that could change the preferred option.

Apply local prices, installation costs and verified operating hours. Test the options using a shorter operating year as well as the central estimate.

Decision worksheet

Project detailStarting point for your team
Decision ownerCapital projects sponsor. Name the person who will approve the next step.
Records to gatherCurrent equipment data, typical running hours and the options or quotes you are considering.
Agreed outputAn options report and workbook with estimates, assumptions and questions for follow-up.
Decision dateRecord the deadline, any unresolved assumption and who will confirm it.

Discuss this case

Tell us what you are considering replacing, why it is on the agenda and when the investment decision is due. Indicate any constraints on installation or shutdown. An outline of the candidate options is enough for an initial discussion.

Email [email protected] and mention ENG-02. All figures in the worked example are illustrative.